
Heater box removed and flaps have been hot glued to the "windscreen/hot" position. The other outlets have been taped up also. The unused ducts have been removed from the dash.



The wiring loom has now been completely removed and I have cut the dashboard to clear the roll cage. I gutted and replaced the front facing vents as I plan on putting instruments/switches there.



The front hubs have been blasted and coated, new bearings and stud/nut kit and brake discs have been fitted.



I removed the fuel tank.

X-Brace fitted.

Sitting on its E30 M3 BBS wheels (15") at last



